the first runway and the second runway D) Apron Taxiway for passengers and cargo transportation E) Air Freight and Logistics Center F) Public utilities prepared by contractual party G) Ground services 2
2025 2026 Construction period Land reclamation Land reclamation 2027 Construction preparation 2nd runway & taxiway preparation Begin operation of new Runway/ Terminal 2 & phase 1 of Airport City Begin
Automatic Optimization System Chiller & AHU Control Lighting Control Output Automatic Control Higher Productivity On Time Reduce Human Error Resource Efficiency 20 Store Head office (Maintenance Center) 10
of fixed asset 15 sets of brand new custom-made Automatic Guided Vehicle (AGV) Transaction date May 2018 Transaction amount Baht 2,086,695 Pricing policy At Book value (transaction amount) and near
of fixed asset 15 sets of brand new custom-made Automatic Guided Vehicle (AGV) Transaction date May 2018 Transaction amount Baht 2,086,695 Pricing policy At Book value (transaction amount) and near
fixed asset 1st transaction Partners of Contract Seller: Cal-Comp Electronics (Thailand) PCL. (“CCET”) Buyer: Kinpo Electronics (Philippines) Inc. (“KPPH”) Type of fixed asset 15 sets of Automatic Guided
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System