operated. General controls are implemented to ensure that all automated applications are developed, implemented, and maintained properly, and in addition, that the integrity of program and data files and of
automated travellator, bringing forth a seamless transaction between luxury and leisure ambiences. The major renovation at CentralWorld is progressing as planned and will gradually commence full operation by
, the Company’s administrative expenses increased in an amount of 334.94 million baht as a result of provision set aside for utility repair works in order to hand over to housing juristic person and for
mainly to employee expenses and repair and maintenance of premises and equipment expenses, whereas marketing expenses fell. As a result, our cost- to-income ratio stood at 42.70 percent, which was still
received more automated system work, thus unable to control the installation time as projected in some projects. - Other income decreased 88.05% from the same period of last year due to in 2017, the Company
quarter of 2017 to 8.51% in the second quarter of 2018 due to The company has an automated system that is never done before, so it is not possible to control the installation time as expected. - Other
to The company has an automated system that is never done before, so it is not possible to control the installation time as expected. - Other income decreased 88.46% from the same quarter of last year
which was charged in the 1st quarter and the higher building repair expense. Selling expenses increased by Baht 12 million as a result of higher property development operations selling expenses
revenue ratios for those years stood at 13.78% and 13.76%, respectively. The higher ratio on a period-on-period basis was attributable to the Company having some expenses in employee expenses, and repair
Co.,Ltd. (Biogas Power Plant) and UWCC (Cambodia) Co.,Ltd. In order to reduce its debt and reshape its investment from less competency business such as Power Plant that cause longer period of repair