KRUNG THAI ASSET MANAGEMENT PUBLIC COMPANY LIMITED|Brown Field Infrastructure Fund | Offering Date : 22/06/2015 - 26/06/2015
increased to 94.66 points (from 88.46 points), operational quality, which increased to 88.36 points (from 82.43 points), the exercise of authority, which increased to 98.06 points (from 92.87 points), and the
. That the appointment of Mr. Chin-Lung Tseng as a replacement director (with authority), be approved, subject to SEC approval. 4. That the appointment of Mr. Chin-Lung Tseng, as the new Chairman of the
clients over the previous 12 months, and 3) continued efficiency improvements of cogeneration power plants after gas turbine upgrade. Stable IU volume with well portfolio diversification Despite the
from the contributions of 1) additional industrial users with total PPA of 25 MW, 2) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively
noticed in Q2’19. In additions, the same upgrade via LTSA with Siemens for ABP5 is scheduled in Q3’19. The progress of SPP Replacement Scheme BGRIM has 5 cogeneration power plants qualified for the SPP
relations. The SFC is the principal regulator of the securities and futures market in Hong Kong and the primary authority for regulating retail funds offered to the public in Hong Kong. The role of the SFC is
Che 1 and 2 solar projects in Vietnam, 2) ABP3’s improving heat rate after gas turbine upgrade in Dec 2018 - Jan 2019 and 3) interest cost saving. • NNP / NNP - owner of the parent increased 6.8% y-on-y
continued improvement in plant efficiency. • EBITDA margin increased y-on-y to 28.6% in Q2’2020 and 28.9% in 6M’2020 from 1) ABP5 and BPWHA1 improving heat rate after gas turbine upgrade in July 2019 and
group comprise independent audit regulators from four ASEAN jurisdictions, namely the Audit Oversight Board of Malaysia (AOB), the Accounting and Corporate Regulatory Authority of Singapore