Fuel Natural Gas Install Capacity (MW) 59.98 Location Nava Nakorn Industrial Promotion Zone, Pathumthani Province Ownership 40% PPA 25 Years with EGAT COD September 2020 Progress 96.00% Yandin Wind
is maintained. In Thailand, LK Solar Floating with an installed capacity of 13 MW and Bo Thong 1&2 wind projects with 16 MW capacity had construction progresses of 16.3% and 21.0% respectively. With
with the SCOD in October 2020. Bo Thong 1&2 wind projects with 16 MW capacity had construction progresses of 29.2% with the SCOD in Q1’2021. Awards and Recognitions In June 2020, BGRIM was included in
lender, for a debt facility of AUD 179 million to use in the construction and development of the Collector Wind Farm, with capacity of 226.8 megawatts, located in New South Wales, the Commonwealth of
capacity of 39 MW which is on process of clarify technical and specification with EPC and staring for land clearing. The project has the scheduled COD by October 2020. Bo Thong 1&2, wind projects in Thailand
Corporation, the lender, for a debt facility of AUD 179 million to use in the construction and development of the Collector Wind Farm, with capacity of 226.8 megawatts, located in New South Wales, the
Energy, which is listed on the Australian Securities Exchange and is leading Australia’s transition to a clean energy future, for 60 percent of energy output from the 226.80 MW capacity Collector Wind Farm
, geothermal energy and wind power. - Lao People’s Democratic Republic (Lao PDR) Lao PDR’s installed capacity is approximately 6,300 megawatts, which are domestic consumption of 2,100 megawatts, export to
, there were commencement of commercial operation of the government solar projects in collaboration with the War Veteran Organization (WVO) and Solar rooftop project (Total installed capacity 9.69 MW). For