Virtual Power Plant (VPP) IFRS Sustainability Standards Capacity Building 28 พฤศจกิายน 2567 | ท าความรูจ้กักบั มาตรฐานการเปิดเผยขอ้มลูดา้นความยัง่ยนื (IFRS Sustainability Disclosure Standards
where much of the natural species composition, structure, and ecological function are present (AFi, 2019). https://accountability-framework.org/wp-content/uploads/2019/07/Definitions.pdf https
2017, at the present all construction work has been completed and ready to operate in the second quarter of this year. Non-hazardous waste recycling plant in Lumphun also has been completed and ready to
Industrial Users (IU) 1.1 1.4 1.2 (14.3%) 9.1% 4.0 3.7 (7.5%) Sales of steam (IU) 1.8 2.9 1.1 (62.1%) (38.9%) 11.1 6.5 (41.4%) Sales from Natural Gas Power Plant 462.0 466.9 507.7 8.7% 9.9% 1,429.3 1,396.9
1.9 0.8 72.7% 13.3 8.4 (4.9) (36.8%) Sales from Natural Gas Power Plant 422.3 466.9 507.7 568.3 60.6 11.9% 1,814.5 1,965.2 150.7 8.3% Sales of electricity - FiT, base tariff and Ft 70.1 72.2 59.5 74.1
Significant events for 2020 to present The acquisition and transfered of 3 biomass power plant companies with total installed power generation capacity of 26.9 MW from UA Withya Public Company Limited On 21
President The Stock Exchange of Thailand The Company wishes to present the Management Discussion & Analysis (MD&A) on the operating and financial status for the 2nd quarter of 2019. The MD&A would enable the
President The Stock Exchange of Thailand The Company wishes to present the Management Discussion & Analysis (MD&A) on the operating and financial status for the 2nd quarter of 2018. The MD&A would enable the
, plant and equipment for building from cost method to revaluation method to reflect appropriate present value. This change affects to the statements of financial position as at 31 December 2019 and the
subsidiary held 99.99 percent by the Company. At the present, SAFE could gain profit from biomass power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy at Narathiwas Province