developers in Vietnam with total installed capacity of 677 MW. Projects under construction are on track Solar WVO-Cooperatives Projects with total installed capacity of 31 MW have 82.8% construction progress
Electricity of Vietnam (EVN) with tariff of USD 9.35 cent per KWh given the condition that the project must be able to achieve COD by June 2019. Projects under construction are on track ABPR5, SPP power plants
’2017, primarily due to 1) the inclusion of new industrial users of ABP5, BPWHA1 and BIP2 and 2) an increase in demand load from existing customers namely Amata Nakorn, Amata City, and Laemchabang
reserve The result of this agreement is to eventually enhance operating margin of our gas-fired combined cycle cogeneration projects. Projects under construction are on track Nam Che 1 Hydro Power Plant
practices regularly monitored and reported. Projects under construction are on track Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 98.9% construction progress. The
million in 2017. • The volume of electricity on-sold to industrial users in Vietnam increased 3.7% year-on-year from 466 GWh in 2016 to 483 GWh in 2017, primarily due to an increase in demand load from
). The volume of electricity on-sold to industrial users in Vietnam increased 1.3% y-on-y from 110 GWh in Q1’2017 to 112 GWh in Q1’2018, primarily due to an increase in demand load from existing customers
debt to equity ratio from 1.6x to 1.0x as of December 31,2019. Projects under construction are on track LK Solar Floating in Thailand, with an installed capacity of 13 MW had 16.3% current construction
on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 86.64% current construction progress which is on process of drainage system piping, double layer brick wall and
with sustainable growth. Projects under construction are on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 50.7% current construction progress which is on process