of utility services in Q1/2018 compared with those in the same period of 2017, (while utility service income is stable), are attributable to the road and water system repairing cost. ▪ An increasing
structural design is completed and the construction of various buildings has progressed by more than 80% of the total construction. At present, the project is in the process of the development of utility
. Currently, the main structural design is completed and the construction of various buildings has progressed by more than 80% of the total construction. At present, the project is in the process of the
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
Directors’ Meeting No. 5/2018 and PF Board of Directors’ Meeting No. 9/2018. The construction of Carnival Magic Project has progressed by about 98.56% of the total construction, or 84.63% of the total
, GPSC consistently focuses on efficient cost management of power plants along with maintaining a stable supply of power to customers. The company has seen the importance of supplying a stable supply of
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
the new products. Therefore, the overall sales figure of the quarter remains stable. 2. The consolidated gross profit margin was 13.14%, increased from the same period of last year at 8.12%. The company
Plants and IRPC Clean Power (IRPC-CP) together with profit realization of Ichinoseki Solar Power 1 GK (ISP1) due to stable weather condition compared to Q1/18 in which there had been heavy snow in Japan