as Enclosure 2. (3) The Board of Directors resolved to approve the Company to dispose of its ordinary shares of Origin Sphere Co., Ltd. (“Origin Sphere”), a subsidiary of the Company (a company in
as Enclosure 2. (3) The Board of Directors resolved to approve the Company to dispose of its ordinary shares of Origin Sphere Co., Ltd. (“Origin Sphere”), a subsidiary of the Company (a company in
percent of the total shares of Origin Ramkhamhaeng, to NRED, at the price totaling THB 311,390,000; (3) The transaction to dispose 49,000 shares of Origin Sphere Co., Ltd. (“Origin Sphere”), with the par
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
Province 10270 (3) The transaction to dispose 49,000 shares of Origin Sphere Co., Ltd. (“Origin Sphere”), with the par value of THB 10 per share, equivalent to 49 percent of the total ordinary shares of
shares of Origin Sphere Co., Ltd. (“Origin Sphere”), with the par value of THB 10 per share, equivalent to 49 percent of the total ordinary shares of Origin Sphere, to NRED, at the price totaling THB
Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The