duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which
trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which it is expected to open for service as a through operation by
duties to design, supply, install, test the M&E Equipment, and trial run, as well as to provide the O&M services for the civil infrastructure (except for the park and ride building) and M&E Systems, which
dividend will be on May 28, 2020. 1.2 The interim dividend payment date will be within June 12, 2020. 2. Approved the joint venture project of Shabushi restaurant in the Lao People's Democratic Republic
per hour. 1.4 The Signing of Project Development for Xe Kong 4A and 4B Hydroelectric Power Project in the Lao People’s Democratic Republic On May 29, 2018, the Company and the Government of the Lao
hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the PPA with EGAT with the contracted capacity of 1,220 MW
plant project in the Lao People’ s Democratic Republic and investment in the construction and operation of transmission line system and substation to the Socialist Republic of Vietnam Attn: President The
Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
(Xayaburi), (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and