restoration plan or operation was not approved by an agency supervising such financial institution or the Commission of the Organization for Reformation of Financial Institution System or has been ordered to
leak-detecting system. · In a case where level of floor or computer centre has lifted for the purpose of instalment the air conditioner system, including instalment electric system and network system
period of backup retention is required, consideration shall be taken for the method of data restoration in the future, for example, if the data is kept in a particular form of media, equipment and software