, Ardor, Aetenity, alef, Single Collateral DAI, 2 30% IOST, Metaverse ETP, INO COIN, Insight Chain, Veritaseum, Stratis, Seele, Ren, Quant, HyperCash, Energi, EDUCare, Crypterium, Bytom 3 50% XMax, Aurora 4
, TrueUSD, USD Coin, VeChain, Verge, Waves, Zcoin, Zilliqa 2 30% Aave, ABBC Coin, aelf, Aion, Bitcoin Cash, Bitcoin SV, Bytom, Crypterium, Energi, Enjin Coin, Ethereum Classic, HyperCash, Insight Chain
always knowing our customer insight. In addition, in this quarter some customers rush to transfer and secure their mortgage before the new BOT’s LTV measure become effective. 2. Selling and Administrative
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 91.55% (The construction plan was 91.52%). The commercial operation date is scheduled in the fourth