which the Company informed the Stock Exchange of Thailand on 13 September 2017. Today (6 October 2017), Advanced Wireless Network Co., Ltd. (“AWN”), a subsidiary of the Company has entered into the Share
progressed 97.45% (The construction plan was 97.09%). The commercial operation date is scheduled in the fourth quarter of 2019. Page 6 - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds
project has entered into the PPA with EGAT with the contracted capacity of 514 MW and EDL with the contracted capacity of 130 MW for 27 years. The construction of the project has progressed 66% (The
with the Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the project has progressed 75.48% (The
revenue and generate a sustain long-term returns. In 2019, CPN progressed with the following asset enhancement initiatives. • The major renovation at CentralWorld, has been started phase by phase since 4Q16
long-term returns. In 2019, CPN progressed with the following asset enhancement initiatives. Renovation programs of existing malls are under way and expects to be completed in 2019 comprising a
Directors’ Meeting No. 5/2018 and PF Board of Directors’ Meeting No. 9/2018. The construction of Carnival Magic Project has progressed by about 98.56% of the total construction, or 84.63% of the total
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
revenue and generate a sustain long-term returns. In 2019, the Company progressed with the following asset enhancement initiatives. Renovation programs of existing malls which have been completed in 2019