estimated depreciation life of SAAM-SP1 power plant from 20 years to 25 year since 2017 onward, to be in line with the useful life of assets. For the year 2016 and 2017, the Group Company presented gross
operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe City, Toyama Prefecture, Japan Contracted capacity : 1.25 MW Installed capacity : 1.43 MW Feed-in Tariff
Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant
cash paid-in for share capital increase of subsidiary in China during late of September. In addition, property, plant and equipment increased by Baht 78 million which were new machines that ordered since
39,000 megawatts by 2026, which focus on power generation from coal-fired power plant. Additionally, the Philippines set target renewable energy generation of 26,000 megawatts by 2026, which supports the
Concession life : 20 years 3) Hikeme Solar Power Plant Location : Fukui City, Fukui Prefecture, Japan Contracted capacity : 1.50 MW Installed capacity : 1.86 MW Feed-in Tariff (FiT) : 32 JPY / kWh Commercial
Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe
, property, plant and equipment increased by Baht 76.42 million which was new machines that ordered since last year but the shipment delayed until the early of this year and there was some capital expenditure
share capital increase of subsidiary in China during late of September. In addition, property, plant and equipment increased by Baht 78 million which were new machines that ordered since last year but the
operations of projects in 2019 which are Rayong Central Utility Plant 4 (CUP-4), Namlik 1 Power Company Limited (NL1PC) and Xayaburi Power Company Limited (XPCL), notwithstanding the recognition of expenses