(EGAT) per EGAT’s dispatch instruction, the gross profit increased by Baht 52 million or 36% from Q1/2017 from the increase in the Availability Rate and the Weight factor. • Rayong Central Utilities Plant
GLOW's IPP power plants of Baht 564 million. This was due to the reduction in Weight Factor in the third quarter of GHECO-One power plant, resulting in a decreased in Availability Payment. In addition
Plants (CUP 1-3) and IRPC Clean Power (IRPC-CP) declined. Additionally, there was a decrease in revenue from Availability Payment (AP) of Sriracha Power Plant due to a lower Weight factor during the rainy
plant and higher weight factor. Besides, increased power dispatch of HHPC is another contribution of increased IPP gross profit. In spite of the above, Sriracha Power Plant's gross profit decreased by THB
Utilities Plant increased after the main customers resumed normal operation from the scheduled maintenance in Q2/2017 even though Sriracha Power Plant had lower dispatch volume to Electricity Generating
/2018; the increase in Availability Payment (AP) of Sriracha Power Plant due to the rise in Availability Rate from 99% to 100% and the rise in Weight factor during summer, together with the depreciation
due to the efficient cost management in the production of electricity and steam from the Cogeneration power plants. Throughout Q1/2018, the Sriracha Power Plant, which is a Independent Power Producer
events in the second Quarter of 2017 The progress in construction projects - Klongluang Utilities Company Limited, (EGCO holds a 99.99% ownership interest.), is a cogeneration power plant project, TJ
revenue from Availability Payment (AP) of Sriracha Power Plant declined from lower seasonal Weight factor. In addition, Sriracha Power Plant and IRPC-CP had maintenance shutdown in Q4/2018. Management
revenue from Availability Payment (AP) of Sriracha Power Plant declined from lower seasonal Weight factor. In addition, Sriracha Power Plant and IRPC-CP had maintenance shutdown in Q4/2018. Management