(Run of the river) with an installed capacity of 15 MW have 97.3% construction progress. The COD schedule has been shifted slightly from December 1, 2018 to 1H’2019 due to longer time for Lao PDR’s
year. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 87.6% construction progress targeted to commence COD on December 1, 2018. ABBREVIATION & OUR PROJECTSFINANCIAL
and target to commence COD and record revenue in December 2018. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW have 92.6% construction progress. The COD schedule has
hedging at Baht 1.8 million. Other income from mold supplier, sales of scraps and obsolete equipment reported at Baht 3.2 million. Gross profit margin was dropped from 33.4% to 32.2% due to long aged
foreign exchange hedging at Baht 3.3 million. Other income from sales of scraps, obsolete machine and equipment reported at Baht 1.8 million. Gross profit was down from 35.2% to 33.1% due to the increase in
) Notification of the connected transaction. The Board of Directors’ Meeting resolved to approve entering into a connected transaction to sell the obsolete assets related to zinc production that are free from any
ended up 21.5% and export sales 78.5%. The Company reported gain from foreign exchange hedging at Baht 8.3 million. Other income from sales of scraps, obsolete equipment reported at Baht 2.5 million
foreign exchange hedging at Baht 2.1 million. Other income reported at Baht 0.9 million from transportation, sales of scraps, and obsolete equipment. Gross profit margin slightly increased from 32.2% to
26.80 million. OLD Policy on allowance for obsolete inventories Considering inventories that are 5 years or older and considering the inventories. The net realizable value is the amount for which an asset
were: Cost of goods sold was Baht 15.21 million, increasing of 130.8% due to lots of new book titles book published and increased in numbers of provision of obsolete stocks. Selling and