rainfall in most projects’ areas. Within this quarter, share of profit from associated companies was recorded at THB 114 million, these can be attributed into share of profit from the wind power plant
Q4/2017, due to contracting demand that resulted from the heavy snowfall during the winter in various regions. As well as, China increasing export of finished product from high utilization rates of
from the same period of the previous year (-1% YoY), mainly from the projects in Thailand, as average irradiation hours of most projects adjusted slightly downward from increase rainfall that lasted
3.47 percent due to frequent rainfall. 1.3 Revenue from caterings and restaurants amounted to 16.14 million baht, a decrease of 30.57 million baht or 65.67 percent due to the company announced the
Dubai price decreased by 0.70 USD/BBL. This is due to the pressure from an increase in supply of Light Sweet Crude which adjusted upward from Libya, Nigeria, and the US. Also the supply for Heavy Sour
water quantity of the past 10 years. The weather forecast of the Department of Meteorology was expected that the total rainfall in the Eastern part of Thailand will be move closing to the average in July
by 1.03 $/BBL, a result of pressure from limiting quota and export of Heavy Sour Crude by the OPEC group following their production reduction policy. Compared to the previous quarter, the average
risks Transition risks • Policy and regulation • Technology development • Consumer preferences Physical risks • Chronic (e.g. temperature, precipitation, sea levels) • Acute (e.g. heatwaves, floods and
the reduced Heavy Sour Crude supplies, after Iran was sanctioned by the US. Management Discussion and Analysis of Business Operation for FY2018 Bangchak Corporation Plc. I 11 Crack Spreads Situation
in moderate level. Water supply in the reservoirs was approximately lower than the average water quantity of the past 10 years as decreasing rainfall in that area. The weather forecast of the