exchange translation of Baht 119.7 million - Gulf VTP operated full quarter. In addition, Gulf TS1 and Gulf TS2, our second and third of the four SPPs to COD this year, achieved COD in July, 2017 and
maintenance in 1Q2017 and higher energy payment which is from higher power dispatch to EGAT in 1Q2018. The increase is also from higher coal price. - Five SPPs (Gulf VTP, Gulf TS1, Gulf TS2, Gulf TS3 and Gulf
2017 contracted available hours despite planed major maintenance in 1Q2017. - B.Grimm Power (WHA) 1 performed full year operation in 2017 (COD in November 2016). In addition, Four SPPs (Gulf VTP, Gulf
to full operation with enhanced efficiencies after planned major maintenance 1Q2017 - B.Grimm Power (WHA) 1 operated full quarter. In addition, Gulf VTP, one of the four SPPs to COD this year, achieved
Road, crosses under the Chao Phraya River at Pak Khlong Talat, and runs along Issarapab Road. Then, the line changes to elevated structure and head to Tha Phra intersection, which intersects with the MRT
IV Road to Charoen Krung Road, passing Wat Mangkon Kamalawat and Wang Burapa. The route then enters to Sanam Chai Road, crosses under the Chao Phraya River at Pak Khlong Talat, and runs along Issarapab
Krung Road, passes Wat Mangkon Kamalawat and Wang Burapa. The route then enters to Sanam Chai Road, crosses under the Chao Phraya River at Pak Khlong Talat, and runs along Issarapab Road. Then, the line
attributable to Owners of the Parent was Baht 2,267.8 million, a 61.2% increase from 2017. Significant Events in 2018: Gulf TS4, a installed capacities of 129.9 MW SPP, representing 32.5 Equity MW, ia
in 3Q2017 to 13.26 million cubic meters in 3Q2018, or increased by 5% mainly from commercial operation of 5 SPPs (Gulf VTP, Gulf TS1, Gulf TS2, Gulf TS3 and Gulf TS4) during 2Q2017 to 1Q2018 and
(3) Siam Chao Phraya Express Limited (collectively the “Sellers of Kerry shares”) where the Sellers of Kerry shares are not connected persons of the Company. The Sellers of Kerry shares currently hold