in TSQM 1 and 2 by hightlighing them in yellow. Additionally, mark the minimum quality objectives mentioned in TSQM 1 and 2 that are separated into sub-quality objectives by highlighting them in blue
• Transmission and distribution infrastructure dedicated to a direct connection or an expansion of connection between power plants with energy intensities less than 100 g CO2e/kWh (life cycle emissions) is