on an ongoing basis or what process taken to reduce that risk. 9 How is client continuance dealt with in the cases of proposed or ongoing litigation? 10 Has the firm been in any tender process
• Transmission and distribution infrastructure dedicated to a direct connection or an expansion of connection between power plants with energy intensities less than 100 g CO2e/kWh (life cycle emissions) is