to No.90, CW Tower B, 21st Floor, Ratchadapisek Road, Huaykwang, Bangkok. On 5 June 2017, the Company started recognizing revenue from the design, construct and operate a potable water production
quarter 2/2018 by Baht 8.76 million the major increased from the contracting of water filtration systems for potable water. It’s started to recognize revenue from 22 March 2019. 3. Cost of sales and
quarter 1/2017 by Baht 34.98 million or 244.79%. which increase from operate potable water production system for Wellgrow Industrial Estate and design & construction of wastewater treatment system for TFD2
million or 112.94%. which increase from operate potable water production system for Wellgrow Industrial Estate and design & WIIK & HOEGLUND PUBLIC COMPANY LIMITED 90 CW Tower A T
and maintenance of water treatment and transfer works as well as distribution networks, network management related measures • New access to safe and affordable potable water and / or adequate sanitation
from the water supply contract from subdistrict administrative organization in Tambon Mai- Khao ,Amphoe Thalang, Phuket with Hydro Enterprise & Aqua Design company Limited (HYDRO), subsidiary of GS in
Name Pre-Transaction Post-Transaction No.of Shares % No.of Shares % Aqua One Water Corporation 40,984,051 41.00 40,984,051 41.00 WUPSD - - 33,986,774 34.00 Mr. Do Tat Thang 33,986,774 34.00 - - Saigon
water supply to some part of Phuket and Phang- Nga that operate by Gold Shores Company Limited (GS) and Hydro Enterprise & Aqua Design Company Limited (HYDRO). This transaction is between the Company and
acquisition of the Project, Production and distribution of water supply to some part of Phuket and Phang- Nga that operate by Gold Shores Company Limited (GS) and Hydro Enterprise & Aqua Design Company Limited
water supply to some part of Phuket and Phang- Nga that operate by Gold Shores Company Limited (GS) and Hydro Enterprise & Aqua Design Company Limited (HYDRO). This transaction is between the Company and