made by Indorama Ventures Public Company Limited (“IVL”) on 9th November, 2017 regarding the acquisition of the PTA assets of Artlant PTA S.A. and the adjacent utility assets of Artelia Ambiente, S.A. in
location of the project to reduce the distance for raw material (Vinasses water) transportation from the Biofuel Mitrphol Factory, Dan Chang From the study of the dept cost structure of the transportation
location of the project to reduce the distance for raw material (Vinasses water) transportation from the Biofuel Mitrphol Factory, Dan Chang From the study of the dept cost structure of the transportation
has also signed a definitive asset purchase agreement to acquire the adjacent utility assets of Artelia Ambiente, S.A. Portugal which has a capacity of 40 MW of electricity plus steam, demineralized
Station and Bang Sue Station - Tha Phra Station) which will be connected and operated as a Through Operation. The MRT Blue Line Extension Project, which has a total distance of 27 kilometers with 20
Station - Tha Phra Station) which will be connected and operated as a Through Operation. The MRT Blue Line Extension Project, which has a total distance of 27 kilometers with 20 stations, connects with the
the present time and in the future, due to such land’s location adjacent to the Head Office of the Company; and for this reason, the Company then absolutely needed to purchase such land. In addition
follows: 1. Approved the purchase of vacant land of 24 – 2 – 24.6 rai, which is the plot of land adjacent to the Company's current plot of land, totaling Baht 85.97 million or equivalent to Baht 3.5 million
and Bang Sue Station - Tha Phra Station) which will operate as Through Operation system of the whole MRT Blue Line Project. The MRT Blue Line Extension Project, which has a total distance of 27
: Along the high-speed rail track that crosses Don Mueang, Suvarnabhumi, and U-Tapao Airport Distance: 220 Km • Consists of a High-Speed Railway and the Transit-Oriented development area (TOD located at the