Directors’ Meeting No. 5/2018 and PF Board of Directors’ Meeting No. 9/2018. The construction of Carnival Magic Project has progressed by about 98.56% of the total construction, or 84.63% of the total
for investors are a crucial component to realize this commitment. • At IFC, we believe that green finance, based on verifiable standards, is key to driving change. We are proud to work with Thailand to
million and the gains from loss of control in Pace One and Pace Three of Baht 8,857 million. A use of reasonable assumptions in the fair value measurement is crucial and has significant effect on the fair
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
assume risk) × A combination of risk preference and risk capacity is an ideal 10 11 g “At the onset of retirement, investment advisors make crucial recommendations to clients concerning asset allocation
electricity grid and storage infrastructure is crucial to meeting the steep decarbonisation goals for energy systems. More flexible and distributed systems are needed to bring about clean electricity. It is
Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The