generation Consulting services Eligible as Green Eligible as Red Eligible as Amber Harm should be remediated within the timeframe in the plan. If not, the status will be revoked. Out of scope Thailand Taxonomy
activities that are limited in time can be structured in real economy as separate time-bound projects. This is especially true for the amber category, where most activities focus on the time-limited movement
..................................................................................................... 27 3.2. Relevant decarbonization measures ........................................................................... 27 3.3. NDC-based amber thresholds
Loan Portfolio THAILAND TAXONOMY INTEGRATION Green Activities 20% Bank’s Loan Portfolio Amber Activities 40% Red Activities 40% Long-Term Target • Greater portion of Green Activities • Systemically
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The