regulatory requirements and environmental issues that may materially affect the issuer’s utilization of the assets. With regard to any material plans to construct, expand or improve facilities, describe the
to minimize the risk of COVID-19 transmission through implementation of IT facilities to support employees in working from home, and improve service system capacity to accommodate the use of services
แฟ็งซ์ (66) 02-634-4114 Head Office: 88 PASO Tower, 18th Floor, Silom Road, Suriyawong, Bangrak, Bangkok 10500, Thailand Tel: (66) 02-634-2222 Fax: (66) 02-634-4114 โราาำนั : 55 ญมู 5 สวนัอุตสำญงรรม เอส
แฟ็กซ์ (66) 02-634-4114 Head Office: 88 PASO Tower, 18th Floor, Silom Road, Suriyawong, Bangrak, Bangkok 10500, Thailand Tel: (66) 02-634-2222 Fax: (66) 02-634-4114 โรงงาน : 55 หมู่ 5 สวนอุตสาหกรรม เอส เอส
PROSPECTUS CHANEL CERES PLC (incorporated with limited liability in England and Wales) EUR300,000,000 Sustainability-Linked Guaranteed Notes due 2026 unconditionally and irrevocably guaranteed by Chanel Limited Issue price: 99.726 per cent. and EUR300,000,000 Sustainability-Linked Guaranteed Notes due 2031 unconditionally and irrevocably guaranteed by Chanel Limited Issue price: 99.400 per cent. The EUR300,000,000 Sustainability-Linked Guaranteed Notes due 2026 (the "2026 Notes") and the EUR300,...