share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total project value
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Causing entrepreneurs to postpone investment plans. For the year 2019, the company recognizes income from the production line installation project and the testing of the production line work in Phase IV and
Installation 2.06 4.62 (2.56) (55.41%) 2 - Construction 2,228.33 1,405.03 823.3 58.60% 3 - Testing and Inspection 88.53 78.24 10.29 13.15% Cost of sales and services (2,778.79) (2,029.13) 749.66 36.94% Gross
well as new customers, which resulted in additional revenue for the group. For the Company, the installation of new machines throughout the year 2016 increased production capacity for existing products
quarter of 2017, customers were unable to install due to heavy rain and flooding. Delayed delivery and installation resulted in Q3 2017 performance as follows; - Decreased on sales from Baht 305.90M in
Group approximately has 15,000 employees; this reflects the Group’s potential for future expansion of FTTx service offering to cover everywhere nationwide; in addition to enabling rapid installation and