higher capital budget framework. As of December 31, 2017, the country’s contracted capacity in EGAT system was 42,433 megawatts, 16,071 megawatts or 37.87 percent of which were generated by EGAT power
and lower than average level by about 5% in August. The average water in the reservoirs in Chonburi and Rayong were 55% and 68% of total capacity respectively. Water Volume (Million Cu.M) Chonburi
by 4.40% QoQ as a result of ongoing repair and maintenance of the overall power generator which gradually improve power supply capacity and escalate power to grid. • Revenue from sale of industrial
) Profit sharing Attributed to the shareholders of the Company 27.54 4.66% 30.76 6.32% (3.22) (10.48) Attributed to the stakeholders with non- controlling capability in subsidiary companies -6.41 -1.08% 6.26
fiber cement tile production line (NT-11) at the Saraburi Plant, having production capacity of 55,000 tons per year and investment budget of approximately Baht 400 million. This is due to the fact that
2017 was due to the low efficiency in asset utilization. At present, PCCA’s production capacity for cosmetic products accounts for approximately 40 percent of the total production capacity. Moreover
Shareholders No. 1/2017 which was held on 30 August 2017 with the disapproval resolution for the Debt to Equity Conversion Scheme, which impacted the Company’s ability to repay the debts in the amount of USD
intellectual property, and utility assets. The Corpus Christi Project currently under development when completed will have nominal capacity of 1.1 million metric tons of PET and 1.3 million metric tons of PTA