for support vessels and vehicles, equipment storage, onshore assembly) Dedicated operational production, manufacturing or distribution facilities for key components, such as wind turbines, platforms etc
of the Philippines, Laos People's Democratic Republic (Lao PDR), Republic of Indonesia and Commonwealth of Australia, where the company has established business bases. Investment of EGCO in each
Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
(Xayaburi), (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the
Power Project 2 1. EXECUTIVE SUMMARY 1.1) Significant events Commercial operation of XXHP XXHP – the two hydro power projects located in Champasak province in the Lao People’s Democratic Republic - has an
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
project, Run-of-River. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with Electricity Generating
Group The Group has principally engaged in distribution of product and equipment, design, assembly and installation, and maintenance service of pure water treatment system; including operate clinical