Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the project has progressed 61.24% (The construction plan was
with EGAT with the contracted capacity of 1,220 MW and Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 99.40% (The
-year feed-in tariff PPA, for the sale of electricity by the project with the contracted capacity of 640 MW. The construction of the project has progressed 60.67% (The construction plan was 62.95%). The
% Inventories 9,461 7,684 7,297 23.1% 29.7% Investments in associated 536 593 0 (9.5%) N/A Consolidation goodwill 438 450 307 (2.5%) 42.9% Property, plant and equipment 8,177 7,302 5,966 12.0% 37.1% Other assets
the previous year. 2017 was a year of record high revenue and profitability. The growth drivers include: 1. The consolidation of financial statements with two outdoor media operators, Multi Sign and
% from the same period of the last year, which was driven by an increases in net selling space from newly opened store under our hardline retailing in Thailand category as well as the consolidation of our
value when converting their operating results from local currencies to Thai Baht for the consolidation of financial statements. The Manufacturing and Selling of Toolings and Metal Fabrications, which is
when converting their operating results from local currencies to Thai Baht for the consolidation of financial statements. The Manufacturing and Selling of Toolings and Metal Fabrications, which is solely
also affected by the strengthening of Thai Baht, which resulted in a decline in total value when converting their operating results from local currencies to Thai Baht for the consolidation of financial
for the consolidation of financial statements. The Manufacturing and Selling of Toolings and Metal Fabrications, which is solely from Halcyon Metal Co., Ltd. or “HM” in 3-month period ended 31 March