Sakhon District, Samut Sakhon Province, total land area of 93 rai 3 ngan 61 square wah (or 37,561.0 square wah) , together with buildings as per construction permission no. 196/2537 consisting of plant
Yadapat were directors. The 10.50-million-baht contract was for the construction of a contaminated plastic distilling plant of an IEC project in Yad Yai District, Songkla Province. Bhusana and Marupong
operations of projects in 2019 which are Rayong Central Utility Plant 4 (CUP-4), Namlik 1 Power Company Limited (NL1PC) and Xayaburi Power Company Limited (XPCL), notwithstanding the recognition of expenses
Provincial Industry Office. Plant registration number jor.3-90-12/59 por ngor water supply production. The factory located Na Toey District, ampher Thai Mueang, Phang Nga Province, Curretly the factory has not
Plant Project in the Republic of Indonesia On March 20, 2019, PT Medco Ratch Power Riau, an indirect joint venture that the Company held 49 percent stake through RH International (Singapore) Corporation
subsidiary held 99.99 percent by the Company. At the present, SAFE could gain profit from biomass power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy at Narathiwas Province
total land area of 93 rai 3 ngan 61 square wah (total land area of 37,561 square wah), together with building as per construction permission No. 196/2537 consisting of plant building, galvanizing plant
of plant building, galvanizing plant, material warehouse, office building, canteen and restroom, total 8 buildings with utility space of 36,964 square meters at Baht 550,000,000 (Five hundred fifty
power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of total shares by SAFE. The Company could start gaining
amotization of the purchase price allocation of Glow IPP Power Plant. 6 Share of Profit from Investments in Associates and Joint Ventures is the Total Share of Profit from Investments in Associates and Joint