control of Marvel Pack Company Limited (Formerly T.K.S.-Wellco (Thailand) Company Limited), a manufacturer of label, by acquiring 49% of the shares and voting interests in the company. As a result, the
Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 9. Stockpile water from Bangpakong river into Bangphra
and new ponds, to supply water to Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 4. SIGNIFICANT
shifting to low carbon fuel sources • Improving water management and efficiency, e.g., by reducing leaks, reducing urban run-off • Installation or upgrade of water capture and storage infrastructure
from the contributions of 1) additional industrial users with total PPA of 25 MW, 2) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively
noticed in Q2’19. In additions, the same upgrade via LTSA with Siemens for ABP5 is scheduled in Q3’19. The progress of SPP Replacement Scheme BGRIM has 5 cogeneration power plants qualified for the SPP
for investment in Original Equipment Manufacturer of cosmetics (new business – Item B.) - - 148.00 14.99% Within 2019 Total 987.24 987.24 987.24 100% Remark * The Company proceeded with the initial
statement for offer for sale of securities and draft prospectus Amount percent and draft prospectus - Item A.) 6. Lending to the Subsidiary for investment in Original Equipment Manufacturer of cosmetics (new
company with a total network of 120 billboards located in Bangkok and upcountry area. Moreover, COMASS has convertible billboards that MACO can upgrade them into digital screens which will potentially
amount by 61.89 million of previous year by 7.7 percent. The decreased was due mainly to the higher sales and administrative expenses of a subsidiary who is the manufacturer of exhausted pipe in automotive