and new ponds, to supply water to Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 4. SIGNIFICANT
shifting to low carbon fuel sources • Improving water management and efficiency, e.g., by reducing leaks, reducing urban run-off • Installation or upgrade of water capture and storage infrastructure
, residence, shopping mall, and office building. The project is located on the corner between Silom Road and Rama 4 Road, Bangkok. CPN’s CAPEX plan for this project is set at approximately THB 17,393 mn, which
following manner: 1. The Company shall acquire 2,953,310 ordinary shares at the par value of THB 100 per share, equivalent to 22.11 percent of the total issued shares of Proud Residence, from Proud Beach Club
Proud Residence, from Proud Beach Club. (Translation) — 2 — 2. The Company shall acquire 425,210 ordinary shares at the par value of THB 100 per share, equivalent to 3.18 percent of the total issued
from the contributions of 1) additional industrial users with total PPA of 25 MW, 2) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively
noticed in Q2’19. In additions, the same upgrade via LTSA with Siemens for ABP5 is scheduled in Q3’19. The progress of SPP Replacement Scheme BGRIM has 5 cogeneration power plants qualified for the SPP
ทุนสวนบุคคล ลงวันที่ 11 มิถุนายน 2547 (“ประกาศที ่สน. 23/2547”) ดวย อนึ่ง ในกรณีทีคู่สัญญาเปนผูลงทุนที่มีถ่ินที่อยูนอกประเทศ (non-residence) หลักทรัพยที่ใหยืม ตองเปนหลักทรัพยตางประเทศเทา
company with a total network of 120 billboards located in Bangkok and upcountry area. Moreover, COMASS has convertible billboards that MACO can upgrade them into digital screens which will potentially
Hotel and Residence Freehold and Leasehold Property Fund 15 14 1 7 43 36 7 19 Total 397 392 5 1 1,196 1,150 46 4 III Cost of sales by business segment (Unit: Million Baht) Third quarter 9-month period