hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the PPA with EGAT with the contracted capacity of 1,220 MW
(Run of the river) with an installed capacity of 15 MW have 97.3% construction progress. The COD schedule has been shifted slightly from December 1, 2018 to 1H’2019 due to longer time for Lao PDR’s
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
year. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 87.6% construction progress targeted to commence COD on December 1, 2018. ABBREVIATION & OUR PROJECTSFINANCIAL
and target to commence COD and record revenue in December 2018. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW have 92.6% construction progress. The COD schedule has
Duong River Surface Water Plant JSC เม่ือวนัท่ี 7 สิงหาคม 2562 โดยมีมูลค่าซ้ือขายรวม 2,073.2 พนัลา้นดองเวียดนาม (หรือประมาณ 2,763.0 ลา้นบาท) ท่ีอตัราแลกเปล่ียน 0.0013 บาทต่อดองเวียดนาม อา้งอิงอตัราแลก
project development. Roi Chak Sam project is aimed to be a luxurious 5-star hotel project in a rare, historic, colonial-era heritage building located along the Chao Praya Riverside on Charoen Krung road
in relation to Roi Chak Sam project. Roi Chak Sam project is positioned to be a luxurious 5-star hotel project in a rare, historic, colonial-era heritage building located along the Chao Praya Riverside
นายคงสทิธ์ิ โจวกิจเจริญ และ นาย Wang, Wei-Chao ซึง่ถือหุ้น 500,000 หุ้น125,000 หุ้นและ 80,000 หุ้นตามล าดบั 7 คณะกรรมการของ CCPT-KY : 1. นาย เสิน่ ซื่อ หยง 2. นาย คงสทิธ์ิ โจวกิจเจริญ 3. Mr. Huang, Kuan
Discussion & Analysis (MD&A) Q1/2018 24 Project Update Project Summary: • Xayaburi Power Company Limited (XPCL)’s project is a Run-of- River Hydropower Plant located on Khong River, 100 kilometers south of