25-year period started from the date of contract). As specified in the contract, the subsidiary shall transfer building, machine and equipment to Krabi municipality without any charges when the
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
started in May 2017, and the Power Plant is expected to commence commercial operation in May 2018. 1.3 Signing of Engineering, Procurement, and Construction Contract of Berkprai Cogeneration SPP Project On
% QoQ due to 4G network investment. Network OPEX was Bt5,051mn, increasing 23% YoY as we started TOT partnership to utilize spectrum and equipment late last year. Excluding the payment to TOT (Bt2,375mn
the new packaging launch in Q3. o Domestic branded canned fruit sales, i.e. rambutan, longan, and lychee were back on track YoY and up c.50% QoQ after the new crop has started. Domestic Contract
, RATCH-Australia Corporation Limited (“RAC”) (an indirect subsidiary in which the Company holds 80 percent stake) has achieved its financial close and started the construction of Collinsville Solar Power
more patients. In addition, on February 14, 2017, the Company opened the second branch of dialysis unit and first hemodialysis service was started on February 15, 2017. Currently, the number of patients
whereas D/E Ratio was at 0.49 and Current Ratio at 0.33. In late 2017, the Company had started to export products to Malaysia. Though the export volume was not significant, the Company aims to diversify
which were better than year 2016 whereas D/E Ratio was at 0.49 and Current Ratio at 0.33. In late 2017, the Company had started to export products to Malaysia. Though the export volume was not significant
25-year period started from the date of contract). As specified in the contract, the subsidiary shall transfer building, machine and equipment to Krabi municipality without any charges when the