from power plant is Baht 44.89 million, or 47.12%. By an increase of Baht 43.67 million from the Solar power plant, Kurihara 2 project in Japan which began commercial electricity distribution (COD) on 25
(Cyber Incident Management: The Board’s Essential Role)” เพื่อให้คณะกรรมการของบริษัทในภาคตลาดทุน มีความรู้ความเข้าใจเกี่ยวกับปัจจัยความเสี่ยงด้านภัยคุกคามทางไซเบอร์ รวมถึงแนวทางการบริหารความเสี่ยง การ
University, Phuket Campus which is set up to treat COVID-19 infected patients. This includes transport of medical supplies and essential goods which are much needed in fight against COVID-19. Airport Related
landfill is complete. However, the landfill cannot be used until authorities have checked the landfill and issue the permit. The permit is expected to be issued by Q3/2018. A new recycling plant (for non
with M&G USA Corp. and its affiliated debtors (“M&G”) to acquire the integrated PTA-PET plant currently under construction in Corpus Christi, Texas (the “Corpus Christi Project”), along with certain M&G
Prachinburi plant and utilizing the plant to produce the products, the production cost has been lowered and gross margin has been higher than those in 2016. The Company started production in Prachinburi plant
recorded the Baht 22.92 million Administrative expenses which were the same Administrative expenses in the same period in 2017 After moving the production equipment to Prachinburi plant and utilizing the
the resolution of approval the investment in Seven Wire Company Limited (“subsidiary”) for constructing plant used in the production and distribution of wire/PC strand and cold drawn wire with the total
Plant 668.6 657.4 884.1 832.9 (51.2) (5.8%) 1,965.2 3,043.0 1,077.8 54.8% Sales of electricity - FiT, base tariff and Ft 68.1 73.5 76.7 81.3 4.6 6.0% 275.9 299.6 23.7 8.6% FiT Premium 6.0 6.0 6.3 6.0 (0.3
” projects and an increase in subsidiaries’ property, plant and equipment. Liabilities As of 30 June 2020, total liabilities were THB 16,365 million, increased by THB 8,033 million or 96.4% from the total