Accounting Renewable Energy Sustainable Product Classification 2018 Internal carbon pricing Process Safety EcoVadis Assessme nt 2015 Sustainability Governing Structure DJSI structure Sustainability Risk
Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the project has progressed 61.24% (The construction plan was
with EGAT with the contracted capacity of 1,220 MW and Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 99.40% (The
-year feed-in tariff PPA, for the sale of electricity by the project with the contracted capacity of 640 MW. The construction of the project has progressed 60.67% (The construction plan was 62.95%). The
health and safety, such as SHA Certification. With less disposable income, travellers are looking for value too – especially families – and the majority will choose destinations they can easily drive to
Automotive Group USA, Inc. (“SAGUSA”) Weihai Bethel Sakthi Automotive Co., Ltd. (“Sakthi Bethel”) Weihai Bethel Sakthi Automotive Safety Systems Co., Ltd. (“WBS”) Sakthi American Corporation Sakthi Real Estate
. (“SAGUSA”) Weihai Bethel Sakthi Automotive Co., Ltd. (“Sakthi Bethel”) Weihai Bethel Sakthi Automotive Safety Systems Co., Ltd. (“WBS”) Sakthi American Corporation Sakthi Real Estate Holdings, Inc. 51.00
shopping malls totaling of 34 locations, comprising 33 malls in Thailand and 1 mall in Malaysia. The closure period is different for each location between 45-56 days. To facilitate safety and convenience for
malls totaling of 34 locations, comprising 33 malls in Thailand and 1 mall in Malaysia. The closure period is different for each location between 45-56 days. To facilitate safety and convenience for
intensifying climate hazards • Ensuring traffic safety • Promotion of environmental conservation Specific renewal of expressways • Measures to address aging infrastructure (promotion of expressway renewal