and new ponds, to supply water to Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 4. SIGNIFICANT
(including sustainable infrastructure for clean and/or drinking water, wastewater treatment, sustainable urban drainage systems and river training and other forms of flooding mitigation); • climate change
แบับัมน้ี้ำาไหลผา่นี้ (run-of-river facilities) โรงไฟฟ้าพื่ลังนี้ำา แบับัม้การกักเก็บันี้ำา (impound facilities) โรงไฟฟ้า พื่ลังนี้ำาแบับัสูบักลับั (pumped storage facilities) ต้ลอดจนี้ สินี้ที่รัพื่ย์และโค์รง
% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the PPA with EGAT with the
the construction into the river. : No. 1/2015 dated January 19, 2015 issued by Harbor Department pass through Na Toei District Administrative Organization which is a reinforced concrete bridge acrose Na
Friday 8th September 2017 at 9.00 am at the River Safari Restaurant, located at 99 Panya Indra Road, Samwatawantok, Klongsamwa, Bangkok. The agenda of the meeting will be the following: Agenda 1 To verify
River Safari Restaurant, located at 99 Panya Indra Road, Samwatawantok, Klongsamwa, Bangkok. The agenda of the meeting will be the following: Agenda 1 To verify the Minutes of the Annual General Meeting
MW / 25 years % Progress (as of 31 October 2017) 73.5% Progress on track Nam Che 1 Hydro Power Project Type of Fuel Hydro (Run of the river) Installed Capacity 15 MW Economic Ownership 72.0% SCOD
จํากดั (เอ็กโกถือหุ้นในสดัส่วนร้อยละ 12.50) เป็นโรงไฟฟ้าพลงันําแบบฝายนําล้น (Run-of-River) ในสาธารณรฐัประชาธปิไตย ประชาชนลาว มสีญัญาซือขายไฟฟ้ากบั กฟผ. จาํนวน 1,220 เมกะวตัต ์ และ Electricite Du Laos
Dec 2018 PEA / MEA PPA 31 MW / 25 years % Progress 21.8% Progress on track Nam Che 1 Hydro Power Project Type of Fuel Hydro (Run of the river) Installed Capacity 15 MW Economic Ownership 72.0% SCOD