project from new target customers in the group. Electrical Appliances and with our major customers have increase in import raw materials, so the revenue from air freight has increased respectively. And
% to net loss 0.77% 5. The projects still being under construction (not yet delivered to the owner) at August 14, 2020 are as follows; Quantity (Projects) Amount (Million Baht) Power Electrical
distributes Pre- zinc structural steel pipe under the Company’s brand “ZIGA” and electrical conduit under the Company’ s brand “DAIWA”. They are innovative substitute products for hot-dip galvanized product or
Company business operation are engineering, construction,and installation of electrical and control systems. The Company has also been providing operation and maintenance services to offshore and onshore
operated by the Seller or its agents which consist of kitchen systems, utensils, electrical appliances, office equipment, furniture, decorations and tools used in Kitchen Plus; 4 (2) All rights and
Chief Executive Officer. During the past year, Mr. Leung has been invaluable in bringing about the integration of Offline-to-Online (“O2O”) Solutions and driving VGI’s development. Going forward under Mr
-officio member of the Board He obtained a Bachelor of Engineering (1st Class Honors) in Electrical Engineering from Chulalongkorn University, Thailand, a Master of Engineering in Industrial Engineering and
Electrical equipment 3. Revenue from logistics management services for the year ended December 31 , 2018 and December 31 , 2017 is 366.73 million baht and 295.75 million baht, respectively, compared to the
Structural Mechanical Piping Electrical & Instrument service (SMP E&I) and Civil construction service. As at 31 March 2019, the Group has backlog for construction service in oil and gas sector totaling of
income for the year sharply increased 212.56 Million Baht, accounting for 61.87% from previous year as the increased in Structural Mechanical Piping Electrical & Instrument service (SMP E&I) and