. In Q4/2022, the Company has opened in addition of 4 new branches at Central world (in the office zone), Terminal 21 Rama 3, Sirikit Conventional Center, and Suvarnabhumi Airport branch. In addition, in
Xayaburi Power Company Limited, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The
(Xayaburi), (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The projects are located in the Laos People’s Democratic Republic (Laos PDR). Xayaburi has entered into the
Power Project 2 1. EXECUTIVE SUMMARY 1.1) Significant events Commercial operation of XXHP XXHP – the two hydro power projects located in Champasak province in the Lao People’s Democratic Republic - has an
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
project, Run-of-River. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with Electricity Generating
scores into 15 estimations as shown in model 5. It can be seen that the estimated coefficients of 𝐸𝑁𝑉, 𝑆𝑂𝐶, and 𝐺𝑂𝑉 are insignificant at any conventional level of significance. Given these mixed
direct (tailpipe) CO2 emission when operated on a track with necessary infrastructure, and use a conventional engine where such infrastructure is not available (bimodal) AND • The trains and wagons are not