the Notification of Office of the National Enclosure Page 4 Broadcasting and Telecommunications Commission Re: Criteria, Procedures, and Conditions for the bid for the spectrum to provide digital
Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 9. Stockpile water from Bangpakong river into Bangphra
and new ponds, to supply water to Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 4. SIGNIFICANT
shifting to low carbon fuel sources • Improving water management and efficiency, e.g., by reducing leaks, reducing urban run-off • Installation or upgrade of water capture and storage infrastructure
increase of 206.2 MB and 133.3 MB, respectively, due to the auctioned projects, which were bid at the end of Q1-2017, has gradually delivered in the Q2-2017. The overall economy expansion in Q2-2017 has
increase of 287.7 MB and 488.6 MB, respectively, due to the auctioned projects, which were bid at the previous quarter, has gradually delivered in the Q3-2017. The overall economy expansion in Q3-2017 has
โดยต้องมีบริษัทจัดการซื้อเพื่อกองทุนภายใต้การจัดการไม่ต่ำกว่า 3 บริษัท และ underwriter หรือ arranger สำหรับ issue นั้น ต้องพร้อมเสนอราคาพร้อมซื้อ (bid price แบบ firm quote) ในจำนวนและวิธีการตามที่ศูนย์
% compared year-on-year, the growth in our cost of service increased by 3.00mb or 2.1% to 147.42mb (Q2 2018: 144.42mb). The slower growth in cost is mainly due to improved productivity in our bid to improve
grown 7.7% compared year-on-year, the growth in our cost of service increased by 3.00mb or 2.1% to 147.42mb (Q2 2018: 144.42mb). The slower growth in cost is mainly due to improved productivity in our bid
มีการซ้ือขายในตลาดหลกัทรัพย ์ใหใ้ชร้าคาเสนอซ้ือปัจจุบนั (current bid price) ณ ส้ินวนัท่ีค านวณ หากไม่มีราคาเสนอซ้ือปัจจุบนัใหใ้ชร้าคาปิดล่าสุดแทน (last closed price) 3.4 หน่วยลงทุน 3.4.1 กองทุนเปิด