2022 2021 Increase (decrease) % Producer and distributor of ready-to-drink milk, drinks 628.05 506.76 121.29 23.93 Immovable property business 3.87 3.04 0.83 27.30 Agriculture and dairy farm 18.98 15.72
) % Producer and distributor of ready-to-drink milk, drinks 1,129.80 700.75 429.05 61.23 Immovable property business 18.80 18.77 0.03 0.16 Agriculture and dairy farm 57.42 63.53 (6.11) (9.62) Total 1,206.02
2020 2019 Increase (decrease) % Producer and distributor of ready-to-drink milk, drinks 503.55 200.54 303.01 151.10 Immovable property business 2.95 4.72 (1.77) (37.50) Agriculture and dairy farm 17.10
distributor of ready-to-drink milk, drinks 700.75 507.48 193.27 38 Immovable property business 18.77 13.77 5.00 36 Agriculture and dairy farm 63.53 43.45 20.08 46 Total 783.05 564.70 218.35 38 Contract
Increase (decrease) % Producer and distributor of ready-to-drink milk, drinks 200.54 167.60 32.94 19.65 Immovable property business 4.72 4.66 0.06 1.28 Agriculture and dairy farm 17.28 17.38 (0.10) (0.57
Bank; the Bank for Agriculture and Agricultural Cooperatives; the Joint Standing Committee on Commerce, Industry and Banking; the Federation of Thai SME; the Thai Venture Capital Association; the
agriculture (e.g., irrigation), forestry, aquaculture, and many other industrial sectors. In addition, in some cases, the same land base, asset, or bond may be used by different operators for a variety or
Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the project has progressed 61.24% (The construction plan was
with EGAT with the contracted capacity of 1,220 MW and Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 99.40% (The
-year feed-in tariff PPA, for the sale of electricity by the project with the contracted capacity of 640 MW. The construction of the project has progressed 60.67% (The construction plan was 62.95%). The