three years of investment, with so far one new kiln (K7) in operation since January adding an extra 50,000 Mt of capacity, the additional potential of developing new products, as well as the option to add
Equity holding (%) Contracted Capacity (MW) Equity Capacity (MW) COD Gulf VTP Gas-fired Cogeneration SPP 25.01 130.0 32.5 May 2017 Gulf TS1 Gas-fired Cogeneration SPP 25.01 130.0 32.5 Jul 2017 Gulf TS2 Gas
group Insufficient compliance testing to ensure both independence and confidentiality where the audit staff providing assurance services in their own capacity 3. Client acceptance and continuance
Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar Power Plant Location : Oyabe
, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW Feed-in Tariff (FiT) : 36 JPY / kWh Commercial operation date : 18 August 2015 Concession life : 20 years 2) Shima Solar
as follows: 1) Kuno Solar Power Plant Location : Kuno City, Ibaraki Prefecture, Japan Contracted capacity : 0.50 MW Installed capacity : 0.65 MW - 14 - Feed-in Tariff (FiT) : 36 JPY / kWh Commercial
unable to operate at its full capacity. Selling Expenses Selling expenses for the fiscal year 2018 were in the amount of Baht 75.20 million which increased by Baht 4.25 million or 5.99% from the previous
well as new customers, which resulted in additional revenue for the group. For the Company, the installation of new machines throughout the year 2016 increased production capacity for existing products
shareholding 25.01% and 74.99% respectively, achieved COD on November 1, 2017 with a total contracted capacity of 125.0 MW, increasing our Equity MW under Operation further to 478.4 MW. The company recently
lowered, and the cancellation of the reclassification of fixed costs at the new factory had incurred as a result of lower-than-normal production capacity to administrative expenses. Consequently, the