structural design is completed and the construction of various buildings has progressed by more than 80% of the total construction. At present, the project is in the process of the development of utility
. Currently, the main structural design is completed and the construction of various buildings has progressed by more than 80% of the total construction. At present, the project is in the process of the
amount of THB 3.55 million (2 installments). The remaining amount to be paid upon the Agreement is THB 5.33 million. Currently, hydraulic platform construction work has progressed to around 50 percent. 4
progressed 62.79% (The construction plan was 62.55%). The commercial operation date is scheduled in the second quarter of 2022. Page 3 1.2 Additional Investments in Joint Ventures - On September 25, 2019, EGCO
Directors’ Meeting No. 5/2018 and PF Board of Directors’ Meeting No. 9/2018. The construction of Carnival Magic Project has progressed by about 98.56% of the total construction, or 84.63% of the total
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
such assets received from or processed for the member can be clearly identified without any doubt; (4) report the custody of said assets to the relevant member within reasonable time. The derivatives
revenue and generate a sustain long-term returns. In 2019, the Company progressed with the following asset enhancement initiatives. Renovation programs of existing malls which have been completed in 2019
avoidance of doubt, it is acknowledged that the definition of target population can vary depending on local contexts and that, in some cases, such target population(s) may also be served by addressing the