, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
project, Run-of-River. The project is located on the Mekong River in Xayaburi Province of the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with Electricity Generating
disclosures from simple metrics such as GHG emissions. In the SET 50 the research found only 12% of companies included or referenced a TCFD report in Annual Reports (a key aim of TCFD is to include climate
power generation from solar and wind power. - Lao People’s Democratic Republic (Lao PDR) Lao PDR had a GDP growth of 6.5 percent from prior year, supported by investments in large infrastructure projects
People’s Democratic Republic (Lao PDR). Moreover, in the first 6 months of 2017, the company and its subsidiaries had gain net cash flow for Baht 1,636 million by gaining net cash flow from operating
, geothermal energy and wind power. - Lao People’s Democratic Republic (Lao PDR) Lao PDR’s installed capacity is approximately 6,300 megawatts, which are domestic consumption of 2,100 megawatts, export to
will drive the industrial growth of the country forward. The company also focuses on growth in focused countries both Myanmar and Lao People’s Democratic Republic (Lao PDR), for international business
, (EGCO holds a 12.50% ownership interest.), is a hydro power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA
ISIC4 codes, then it will be easier to measure them against the Thailand Taxonomy which also employs the ISIC4 codification. However, it is not always a simple process. Some interpretation may be