. Net profit in Q3/2017 was Baht 78 million, a decrease of 52% YoY due to 1) higher cost per unit resulted from lower capacity utilization YoY; and 2) higher depreciation resulted from additional
Electricity Authority (PEA) was 29,968 megawatts, lower than the peak demand of 30,303 megawatts in 2017 by 1.11%. A decrease in the peak demand was the consequence of cold weather in the beginning of the year
project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has
3,693.57 (1,258.59) (34.1) Profit before FX 532.44 2,175.99 (1,643.55) (75.5) 2,516.29 3,879.22 (1,362.93) (35.1) * excluding fuel cost Quarter 2 6-Month Increase (Decrease) % Increase (Decrease) % The
utilization rate to available capacity, and eventually a higher cost of goods produced and low margin. To offset a slowdown in orders, the Company reduced costs by obtaining better sources of raw materials
continued to grow well by c.20%. Net profit in Q2/2017 was Baht 61 million, a decrease of 57% YoY due to 1) higher cost per unit resulted from lower capacity utilization; 2) higher depreciation resulted
ตารางการรายงานข้อมูลคุณภาพการให้บริการและการใช้ความสามารถของระบบเทคโนโลยีสารสนเทศ (IT usage capacity) (แนบท้ายประกาศ กธ. 14/2565)
of Baht 241.92 million, a decrease of Baht 7.19 million or 2.88%, which was a decrease of revenue from printing business at Baht 24.01 million or 16.58% and an increase of revenue from power plant at
from the second quarter Ended June 30, 2016. That effected higher cost of goods sold from the fixed cost for the factories employee expense that couldn’t be used full capacity of production. หน้าที 2 จาก
Capacity Utilization 71.06% 69.90% 1.16% Revenue from sales 340,764 100.0% 355,059 100.0% (14,295) (4.0%) Cost of sales (279,155) (81.9%) (300,548) (84.6%) (21,393) (7.1%) Gross Profit 61,609 18.1% 54,511