-year, with operating rates at 90%, following the ramp up of the expanded PTA capacity in Rotterdam and normalizing production in Canada, higher IPA volumes and full capacity utilization at EOEG plant in
continued to gain further traction driven by both growths in domestic and external demand. The value of merchandise exports expanded solidly on the back of the continual increase in export quantity and rising
sentiment. Meanwhile, exports and tourism expanded at a slower pace, partly due to the impact of the US trade policies and a drop in Chinese tourist arrivals. Headline inflation in the third quarter of 2018
line with the continued economic slowdown, whereas overall consumer loan continued to grow at a high rate despite a slower growth in mortgage lending and auto loan, personal loan and credit card expanded
Company’s business operation which will be expanded into large scale project (ie. bile and waste water system and water INT Pad) www.filtervision.co.th 5.5 To utilize as other working capital of the Company 6
construction may not be completed within the extended period, HSMC will require to pay MCDC of 20,000 MMK per day. Capacity (m3/day) 2,000-2,200 m3/day Construction Period Within Quarter 4/2018 Scheduled
from HSMC. HSMC is able to expand or postpone the construction period up to 2 times. If the construction may not be completed within the extended period, HSMC will require to pay MCDC of 20,000 MMK per
from HSMC. HSMC is able to expand or postpone the construction period up to 2 times. If the construction may not be completed within the extended period, HSMC will require to pay MCDC of 20,000 MMK per
) Having backup system and measures for emergency situation to prevent the extended discontinuing of operation. 1.1.2 Document and Information Security Having adequate security system for document and
information should easily be recalled (3) Having backup system and measures for emergency situation to prevent the extended discontinuing of operation. 1.1.2 Document and Information Security Page 16 of 32