Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 9. Stockpile water from Bangpakong river into Bangphra
and new ponds, to supply water to Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 4. SIGNIFICANT
shifting to low carbon fuel sources • Improving water management and efficiency, e.g., by reducing leaks, reducing urban run-off • Installation or upgrade of water capture and storage infrastructure
observed. In this paper, exogenous variable is predetermined type not strictly category with the implication of Hausman test. The consideration of order condition and rank condition is recognized under the
current market value of each type of instrument or securities. Clause 7/2 3 Bill of exchange or promissory note that the derivatives broker will invest under Paragraph 1(4) of clause 7 shall rank the
Bill of exchange or promissory note that the derivatives broker will invest under Paragraph 1(4) of clause 7 shall rank the highest in short-term issue rating or the three highest in long-term issue
Bill of exchange or promissory note that the derivatives broker will invest under Paragraph 1(4) of clause 7 shall rank the highest in short-term issue rating or the three highest in long-term issue
category with the implication of Hausman test. The consideration of order condition and rank condition is recognized under the matrix form to limit the unidentified and over identified. Page 22/40 Research
from the contributions of 1) additional industrial users with total PPA of 25 MW, 2) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively
noticed in Q2’19. In additions, the same upgrade via LTSA with Siemens for ABP5 is scheduled in Q3’19. The progress of SPP Replacement Scheme BGRIM has 5 cogeneration power plants qualified for the SPP