ไม่มีโครงข่ายเป็นของตนเอง) จากคณะกรรมการกิจการกระจายเสยีง กจิการโทรทศัน์และกจิการโทรคมนาคมแห่งชาต ิเป็นระยะเวลา 5 ปี เมื่อวนัที่ 25 เมษายน 2561 ซึ่งในอนาคต ไทธนันต์จะก่อสรา้งสถานีฐาน (Base Station) และเสา
electric motorcycle charging and battery replacement station and electric vehicle charging station businesses. 6 Forth Smart Service Public Company Limited (FSMART) 3Q19 Management Discussion and Analysis
disposal The Company has a policy to develop the land owned by Prime-A as a premium standard condominium project, since the location of the project is within close proximity to Thonglor BTS station. The
volume growth. There were an expansion of service station locations, the number of service station as of the end of 2018 was 1,175 locations, with 74 new service stations. The company has also rebranded
synergy between VGI and Rabbit Group through the “Station Sponsorship” campaign with OPPO on 3 BTS stations (Mo Chit, Ploenchit and Saladang) Synergy between VGI and Rabbit Group As of 30 June 2017, under
., Ltd.’s logistic cost in accordance with increased sales volume, (4) lease payment for oil depot and land for service station expansion, and (5) office expenses. 5. Gains from crude and product oil price
Restart Service of Kemerton Power Station On October 23, 2018, the Diesel Generator Installation Project of the System Restart Service (Black Start) of Kemerton Power Station (under the Operation of RATCH
Station (2), Lumpini Selected Sutthisarn-Saphankwai, Lumpini Park Vibhavadi-Jatujak, Lumpini Park Boromratchachonnanee-Sirindhorn, Lumpini Ville Pattanakarn-Srinakarin and Lumpini Ville Suksawasdi-Rama 2, 1
THB. Two projects are completed and ready to be handed over, namely, Lumpini Ville Sukhumvit 76-Bearing Station and Lumpini Ville Ratchaphruek-Bang waek. There are projects developed from the previous
380.39 293.41 86.98 29.64 - LE RICH @Rama 3 59.53 59.53 3.10 56.43 1,820.32 - The Rich @ Sathorn - Taksin 277.12 277.12 - 277.12 100.00 - Rich Park @Bangson Station 16.30 16.30 4.47 11.83 264.65 - RICH