team to ensure assistance and advice on withdrawal, receipt of returned assets or transfer of digital assets . The 24-hour https://www.sec.or.th/EN/Pages/News_Detail.aspx?SECID=7647 <
assets or transfer of digital assets . The 24-hour https://www.sec.or.th/EN/Pages/News_Detail.aspx?SECID=7647 ’ digital assets under BX’s control or possession to other wallets which are not purported to
team to ensure assistance and advice on withdrawal, receipt of returned assets or transfer of digital assets . The 24-hour https://www.sec.or.th/EN/Pages/News_Detail.aspx?SECID=7647 <
digital channels • Connectivity 5 Provinces, 3 Airports with 9 stations • Distance: 220 km • Train Maximum Speed 250 km/hour • Travel Time Within 60 minutes HIGH-SPEED RAIL • Capacity: Increase container
of 241 million baht, an increase of 111 million baht or 85% y-y and 26% q-q drove by auto loans business expansion. The Company also launched Motorcycle Big Bike Hire Purchase in September 2019, which
Megawatts and 175 Tons per hour, respectively. The ERU project has a total value of not exceeding USD 757 million (The value was appraised by technical advisor, where construction cost and other expenses
Megawatts and 175 Tons per hour, respectively. The ERU project has a total value of not exceeding USD 757 million (The value was appraised by technical advisor, where construction cost and other expenses
already commenced commercial operation, separated into electricity generation of approximately 1,530 MW, steam of approximately 1,512 tons per hour, processed water of approximately 2,080 cubic meters per
the PPA with EGAT for 25 years with the contracted capacity of 90 MW. Additionally, the project has the 7 years contract with industrial user to sell 12 MW of electricity along with 13 tonnes per hour
and technologies that encourage overall efficiency (high load, occupancy and flow); a. Technologies that allow new behavior (such as qualifying vehicle car pool clubs, bike sharing) b. Better