11.69% comparing with same period previous year. The cost of power plant increased Baht 24.55 million or 39.30%. By an increase from the Solar power plant, Kurihara 2 project in Japan in the amount of
capacity of 39 MW which is on process of clarify technical and specification with EPC and staring for land clearing. The project has the scheduled COD by October 2020. Bo Thong 1&2, wind projects in Thailand
result was increased by Baht 75 million due to higher wind speed, comparing to the same period of previous year, leading to higher electricity generation. NTPC: Unit : Million Baht 2018 2017 Change
Projects under construction - Yunlin Project (The project), a project of Yunlin Holding GmbH (Yunlin) (EGCO holds a 25% ownership interest), is an offshore wind farm power plant project which located in the
%) Profit (Loss) before the effects of foreign exchange, deferred income tax and lease income 43 (13) 56 431% - CWF : The operating result was increased by Baht 56 million due to higher wind speed, comparing
148 73 75 103% - BOCO ROCK : The operating result was increased by 75 million Baht due to higher wind speed, comparing to the same period last year, leading to higher electricity generation. Quezon
, deferred income tax and lease income 75 33 42 127% - CWF : The operating result was increased by Baht 42 million due to higher wind speed, comparing to the same period of previous year, leading to higher
projects in Thailand, electricity sales was consistent. There were also shares of profit from Wind power plant and Geothermal power plant. However, in Q1/2017 recorded gain from selling of asset of Suimei
of THB 793 million. This year, power plant business group recorded share of profit from associated companies of THB 204 million, comprised of THB 39 million from Wind power plant business, and THB 164
40 percent increased in the amount of Baht 453.78 million; as well as, the profit of Phu Fai Mining Company Limited, a joint venture for coal mining and trading to HPC, in a portion of 37.5 percent