million, improved by THB 224 million or 13.43% up from 2Q2016 mainly from higher export sales volume which increased by 29.31% The consolidated gross profit was THB 679 million, noticeably improved by THB
Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is
prepared the production of B100 to follow the new standard of Monoglyceride content not exceeding 0.4%. Together with ability to efficiently manage raw material cost, gross profit was improved from the
earners. The primary energy consumption in Q1/2018 has improved by 1.1% compare to Q1/2017 growing parallel to the overall economic performance which has risen mainly from the increase the exports and the
September 2017 driven by the continuous increasing in demand from trading partners in oil sector and domestic. Primary energy consumption in 2017 has improved by 2.4% compare to previous year and in the same
improved only by 0.6% due to the low temperature, off-season rain and the hot storm in some areas in the first quarter of 2018 together with the increase in Independent Power Supply (IPS). The peak
increased from business expansion. For the 9M/2018, the net profit improved by Baht 420 million or 17% from 9M/2017. The gain was primarily due to start-up of IRPC-CP Phase 2 and ISP1 in Q4/2017 and the
Business improved from 31.6% in 1Q2017 to 35.1% in 1Q2018 mainly due to increased selling volume and ability to manage operating costs effectively. Our 1Q2018 Gross Profit was recorded at Baht 149.0 million
) was Bt32,455mn, +6.0% YoY and +0.9% QoQ, resulting in YTD growth of 5.5%. Increasing 4G penetration (42%) and data usage (5.9GB/data sub/month) improved mobile revenue to stand at Bt31,569mn, +3.9% YoY
terms of % to revenue improved from 7.5% in Q4 2021 to 5.9% in Q4 2022. Core operating profit (defined as Earnings before Interests and Taxes exclude interest income, gain (loss) on exchange rate and